Changes in the composition of the Board of Directors of NC KTZ JSC
Changes to the composition of the Board of Directors of NC KTZ JSC were made b...
On December 7 this year at 09.20 on the site of Semey-Shar of Semey branch of the road there was getting off the rails of 12 loaded coal wagons of train № 2305.
No casualties were reported.
According to a special commission created by “NC “Kazakhstan Temir Zholy” JSC to clarify the circumstances of the accident, the cause of getting off the rails of the cars was a kink of the side frame of the sixth wagon. More than 400 meters of track were damaged.
Two recovery trains are operating at the scene. More than 70 experts are also involved in reactivation of the train traffic.
Passengers of the trains, delayed due to an accident, are delivered to destinations by buses of “NC “KTZ” JSC.
Reactivation of the traffic on the section of Semey-Shar is scheduled for 21.00.
Press Service
of “KTZ-Freight transportation” JSC
Changes to the composition of the Board of Directors of NC KTZ JSC were made by the decision of the Sole Shareholder of NC KTZ JSC dated April 26, ...
Akmola railway workers, applying the technology of lengthening the warranty areas, have improved the carrying capacity of Astana station. Now transi...
The locomotive repair program, aimed at improving the reliability of railway technology, was completed in 2018. More than 9.5 thousand scheduled mai...