Adress 010000,Astana city, Kunaeva 6
Call-center 8 (7172) 60-30-30
8 (7172) 60-32-52
The repair program for locomotives is complete
5578 / 19.01.2019 10:00

The repair program for locomotives is complete

The locomotive repair program, aimed at improving the reliability of railway technology, was completed in 2018.
More than 9.5 thousand scheduled maintenance and repairs of main and shunting locomotives of different series were conducted in 2018. Including 46 locomotives of a series VL-80 and CME underwent a major overhaul with an extension of service life.
- As part of the implementation of the plan of measures to improve the technical condition of locomotives, audits on the quality of repairs are conducted on an ongoing basis. Monitoring of Locomotive Maintenance Points (PTL) and service centers is being monitored for their supply with metalworking tools, measuring devices and other equipment. Employees of the fire protection plant, service centers, and locomotive crews are trained in the maintenance and troubleshooting of locomotive units, ”said Yeldos Tokbergenov, general manager of the organization for repairing traction rolling stock of KTZ-Freight.
Locomotive brigades before the trip and at the stops at the railway stations examine the locomotives, assess the state of attachment, the responsible units, components and parts. Inspection of brake equipment, automatic couplers, speed-gauges, automatic locomotive signaling, and wheelsets is being carried out.
Поделиться:
Популярные новости
938 / 31.07.2024

KTZ Express invites you to participate in an online survey on the implementation of the Digital Single Window system.

We ask all customers to take part in an anonymous survey regarding the implementation of the DSW system. The survey will help us understand your o...

3629 / 17.05.2023

Changes in the composition of the Board of Directors of NC KTZ JSC

Changes to the composition of the Board of Directors of NC KTZ JSC were made by the decision of the Sole Shareholder of NC KTZ JSC dated April 26, ...

5457 / 21.01.2019

The capacity of Astana station has increased the elongated "shoulder"

Akmola railway workers, applying the technology of lengthening the warranty areas, have improved the carrying capacity of Astana station. Now transi...

Last news

Горячая линия

Вы можете сообщить о любых нарушениях Кодекса поведения, в том числе о фактах коррупции, мошенничества, неэтичного поведения, дискриминации.

Read more