Adress 010000,Astana city, Kunaev str., 6
Call-center 8 (7172) 60-30-30
8 (7172) 60-32-52
For railway workers of the Mangystau department they conducted a demonstration examination
1881 / 04.01.2019 12:30

For railway workers of the Mangystau department they conducted a demonstration examination

At the Bolashak station, an indicative commission inspection of infrastructure facilities was held. Heads of stations, managers and specialists of linear enterprises of the Mangystau branch of the GP took part in it. They checked the current state of the station infrastructure, received recommendations for identifying "weak" places in the maintenance of the infrastructure.
- Educational and demonstration examinations are one of the forms of training managers at the line level. They are being organized to conduct a comprehensive inspection of the infrastructure and enhance the technical knowledge of railway workers, ”said the chairman of the study and demonstration survey, the first deputy director of the Mangystau branch, Yerlan Burkhutov.
In the course of the demonstration inspection, the state of the structures, devices and service and technical buildings, as well as railways and switches, devices for signaling and signaling systems and power supply, and much more, was assessed.
After the inspection, a conference call was held with the participation of station chiefs, road foremen, electricians to study the Rules for organizing and conducting a monthly commission inspection of the railway station.
Commission monthly inspection is conducted from the 1st to the 10th day of each month, in exceptional cases up to the 15th day.
Поделиться:
Популярные новости
771 / 17.05.2023

Changes in the composition of the Board of Directors of NC KTZ JSC

Changes to the composition of the Board of Directors of NC KTZ JSC were made by the decision of the Sole Shareholder of NC KTZ JSC dated April 26, ...

2919 / 21.01.2019

The capacity of Astana station has increased the elongated "shoulder"

Akmola railway workers, applying the technology of lengthening the warranty areas, have improved the carrying capacity of Astana station. Now transi...

2832 / 19.01.2019

The repair program for locomotives is complete

The locomotive repair program, aimed at improving the reliability of railway technology, was completed in 2018. More than 9.5 thousand scheduled mai...

Last news

Горячая линия

Вы можете сообщить о любых нарушениях Кодекса поведения в том числе о фактах коррупции, мошенничества, неэтичного поведения, дискриминации

Read more